COMMISSION MEETING DATE:  1/17/2017
REQUESTED ACTION BY COMMISSION:  Approve the list of top ranked qualifiers as determined by the Evaluation Committee from the submissions received in response to the "Request for Qualifications for Cured-In-Place Pipe (CIPP) Lining,  RFQ No. 057-2821-16/TP,  as pre-qualified Contractors with the skills, experience and requisite products needed to successfully perform Cured-In-Place Pipe Lining. 
EXPLANATION OF REQUEST: 

CONTRACT TERM:  JANUARY 18, 2017 TO JANUARY 17, 2020

 

The City issued a Request for Qualifications seeking qualified Contractors (manufacturer’s representative) with specific experience with installing cured-in-place pipe liner using a resin-impregnated flexible tube method that is formed to the original conduit by use of hydrostatic pressure.  Planned rehabilitations for the City’s Wastewater System will consist of, but are not limited to:  cleaning the existing sewer gravity mains; internal pre-rehabilitation closed circuit television (CCTV) inspections; furnishing and installing CIPP liners; reconnection and grouting of existing service laterals; obtaining material field samples for testing; preparation of inspections reports and CCTV post rehabilitation final inspections. 

 

On September 7, 2016, the City received five responses to this Request for Qualifications.  The responses were reviewed and evaluated by the Ranking Committee.  A Public Meeting was held on Monday, December 19, 2016 for the Ranking Committee to read their scores which resulted in the top three ranked firms listed below. 

 

 

 

FIRM

SCORE

(Maximum – 400)

RANKING

Insituform Technologies

366.50

1

Lanzo Trenchless Technology

346.00

2

SAK Construction

336.50

3

 

The City will issue a Bid for each specific CIPP Lining Project, on an “as-needed basis” to the three pre-qualified contractors.  The lowest bid from the three pre-qualified contractors will be brought to Commission for approval to award.

 

The contract term will be three (3) years with an option for two (2) additional one-year terms, renewed at the sole discretion of the City. 

 

HOW WILL THIS AFFECT CITY PROGRAMS OR SERVICES? 

By pre-qualifying contractors to perform the work as specified in the bids, the City will be assured that qualified and experienced utility contractors will submit bids to complete the work. 

FISCAL IMPACT:  Budgeted 

There is no fiscal impact as a result of this approval; each low bid over $25,000.00 will be submitted to Commission for approval. 

ALTERNATIVES: 

Not approve the pre-qualified contractors and issue a bid to all utility contractors for each CIPP Liner Project. 

STRATEGIC PLAN:
STRATEGIC PLAN APPLICATION: 

CLIMATE ACTION: 
CLIMATE ACTION DISCUSSION: 
Is this a grant?  
Grant Amount: 
ATTACHMENTS:
TypeDescription
AttachmentSummary of Reviewers' Scores
Tab SheetsTabulation Sheets
REVIEWERS:
DepartmentReviewerActionDate
Financial ServicesAnswererApproved1/6/2017 - 10:07 AM
Financial ServicesAnswererApproved1/6/2017 - 10:07 AM
LegalAnswererApproved1/10/2017 - 2:36 PM
City ManagerAnswererApproved1/11/2017 - 9:02 AM